Why a project gets more expensive toward the end
The usual reason is that all the work is estimated upfront as one number. At that point, much is still unknown. Is the 1C configuration standard or customized, how should data be moved from the old system, how will staff actually use the app. They come up one by one during the work, and each needs extra time. For example, if halfway through it turns out that agents work where the internet is poor, the app needs an offline mode and a sending queue. That is not a small fix but separate work.
The second reason: requirements change during the work. This is normal. People often cannot say exactly what they need until they hold the first version of the app. But in one big contract, every change means either an argument or an extra invoice.
So two options remain at the end: the budget grows or part of the work is cut. Both are unpleasant for the client, because the decision comes at the worst moment, when most of the money and time is spent.
How stage-based pricing works
We calculate the price for each project and split it into stages. The stages and their cost are agreed in the proposal before work starts.
A stage is small, so it can be estimated accurately. We keep the first stage as small as possible: usually one process that takes the most time. It should end with a working result. The next stage is refined based on the previous one.
In the stage-based model, a new idea or a changed requirement goes into the next stage's plan and is estimated with it, instead of reopening the current stage. Changing requirements stop being a problem and become a normal part of planning.
Short definitions are in the glossary: stage-based pricing and MVP.
Where the price comes from
A stage price needs a visible scope of work, so the price comes after diagnostics. Diagnostics produces a process map, a list of automation points sorted by value, and an integration table. From these, the proposal sets out stages, timelines and prices, a list of risks and how to handle them, and a specific result for the first stage.
The risk list deserves special attention. In a project that grows costlier at the end, risks are usually not written down: everyone learns about them along the way. In the proposal, a risk is named upfront, for example that changes are needed on the 1C side and who will make them.
Price factors differ by project, but usually include:
- the number of platforms: iOS, Android, admin panel, website
- integrations: 1C, Odoo, amoCRM, payment systems, maps and delivery
- offline work and background GPS
- AI, for example search by voice or photo
- data migration from the old system
Each item can become a separate stage. So even with a long list, the first stage stays small.
Blitz: a year of stage-by-stage work
Blitz is a German language school. Its system grew together with the school over a year. Today it has one backend and four interfaces: an admin panel and apps for students, teachers and parents. It is connected to Hikvision Face ID attendance, Click, Payme and Paynet payments, and amoCRM. Students and payments used to be in ModMe, and a separate tool was written to migrate them.
This scope would have been hard to estimate as one number upfront: four interfaces, four external systems and a data migration. Working in stages spreads the costs over time. New parts were added to a system that was already running.
Each new interface is connected to the same single backend. That is why payments and attendance look the same in the admin panel and in the parent app. In November, the Blitz system is being handed over to the school's own development team, and the code and documentation stay with the client.
DeepVision: two stages, three months
DeepVision is an Odoo integrator. For its client, we built an app for field agents in two stages, from February to April 2026. All data stays in the client's Odoo, and no separate database was created.
The first stage covered the agent's core work:
- planned and unplanned visits, results, photos and videos
- an offline queue: visits, photos and location are stored on the phone and sent to Odoo when the connection returns
- background GPS
The second and final stage added leads and orders. The agent opens a new lead, selects a customer, searches for products and places an order through the cart. The order is created in Odoo.
The logic is simple: first what the agent does every day, then sales. The sales section was built on top of the core work, and customers, products and prices come from Odoo. The app is in use at one of DeepVision's clients.
The next step is also known: add orders to the offline queue. Right now an order is sent only when there is internet. This is normal for stage-by-stage work: tasks remain on the list, but the app is already working.
What happens at the end of a stage
Stage-based pricing works only if the stage boundary is clear. So the expected result of each stage is written down in advance.
Progress and results of each stage are reviewed together with you. Your comments are taken into account when the next stage is planned.
There is one more reason the next stages should not get more expensive: a new part must not break an old one. If every new stage means rechecking and fixing earlier parts by hand, the longer the project, the more it costs. Important parts are checked with automated tests: the Blitz backend has 228 test files, and the ONUR backend has 56. Payments, 1C sync and stock are tested first.
Who owns the code, documentation and IP is agreed in the contract. This matters for stage-by-stage work too: it affects who can build the next stage and when.
How to choose the first stage
The first stage should be small but useful. Four rules help with the choice.
- 01Start with the one process that takes the most time. It is usually the first line of the sorted list from diagnostics.
- 02If an integration is the foundation, include it in the first stage. In the ONUR project, the app, the admin panel and the 1C exchange were built together. An app for sales agents or wholesale clients can later connect to that backend.
- 03Put the extras off until later. For example, first the catalog, stock and orders, then payments and AI search.
- 04Write down the result precisely. The proposal states a specific result for the first stage, so both sides understand the same way when the stage is finished.
The order differs in every company. With Trest 12, the work started with a website, and a quality control app came later. More details: our process.
What stage-based pricing does not guarantee
To be honest about this too: the final total for the whole project is not set as one fixed number at the start: later stages are refined based on the results of earlier ones. In return, every additional cost becomes a decision you saw and made yourself, not a surprise invoice at the end.
A rough guide to timelines: a small app takes 2–4 weeks, a mid-sized system 1–2 months, a large ERP or AI platform 3–6 months. We give the exact timeline after diagnostics, stage by stage. More about apps and internal systems: mobile app for business and ERP and internal systems.
In short
- A project gets more expensive at the end because unclear points surface after one big estimate.
- With stage-based pricing, the price and result of each stage are agreed in advance.
- A new requirement goes into the next stage's plan instead of reopening the current stage.
- The Blitz system grew in stages over a year, and the DeepVision app was built in two stages.
- The first stage is the one process that takes the most time.
Frequently asked questions
How is the price of a stage agreed?
The price depends on the project and is different for every project. We calculate it for the project and split it into stages: the stages and their cost are agreed in the proposal before work starts.
How long does one stage take?
The scope and timeline of each stage are written in the proposal. The first stage is planned as the smallest part that delivers a working result.
Can we know in advance what the whole project will cost?
The proposal includes a roadmap with the stages and their cost, so you see the overall picture before work starts. Later stages are refined based on the results of earlier ones.
Which projects have you worked on this way?
The Blitz system grew in stages over a year. The DeepVision agent app was built in two stages: first visits, the offline queue and GPS, then leads and orders. With Trest 12, the work started with a website, and the app came later.